How to make your April 1st ACF reporting deadline

One of the first deadlines for California fleets to comply with the Advanced Clean Fleets law is coming up – by April 1st, 2024, nearly all* municipal, county and state fleets need to register and submit their first reports to CARB. If you are a state, county or local government fleet – this guide is for you.

If you are a drayage fleet, or a high priority or federal fleet, you should have already reported to CARB.

This is a “quick start” guide to what reporting by April 1st requires. For full, detailed guidance, you can watch the series of webinars on ACF reporting from CARB. We recommend starting here – a 2 hour Q&A session from March that is among the more condensed guides from CARB.

* If your fleet does not own, lease, nor contract to any third party fleets using vehicles over 8,500 lbs, then you may not be subject to ACF, and you may not need to meet the April 1st filing.

1 – Log into TRUCRS portal and update your fleet profile

If you are a public fleet in California, chances are that you’ve filed reports of some sort to CARB via the TRUCRS portal before.

If your fleet has had to comply with common CARB rules in the last decade like Truck & Bus regulations, Airport Shuttle regulations, or Solid Waste & Heavy Crane regulations, you will have used TRUCRS before. Log in here.

Some small agencies may not have used TRUCRS before. Create a TRUCRS account using the guidelines from CARB here.

Before continuing to the next steps, make sure your fleet profile is updated to include every vehicle in your fleet and the updated odometer or hubodometer reading, and the other fields the TRUCRS forms require.

Important: you may have already included vehicles subject to older CARB regulations such as buses or heavy equipment in your TRUCRS profile. However, starting April 1st, many vehicles in your fleet (including smaller cars that aren’t directly subject to the ACF) may need be logged and tracked in TRUCRS. If you continue on the default reporting (Model Year – see more in the next section), then you only need to register vehicles over 8,500 GVWR. However, if you elect to use the Milestone Option (again, see more in the next section), then you also must also register some types of vehicles that fall under 8,500 GVWR.

For large fleets, you can update TRUCRS in bulk using their Large Fleet Upload spreadsheet.

It’s important to note that some new fields of vehicle information have been added to TRUCRS as part of CARB’s new ACF reporting. In the TRUCRS portal where you can add a new vehicle or edit an existing one, you must fill out these new fields:

If you have already begun to replace an ICE vehicle with an EV, or if you have converted an ICE to an EV, then you need to identify the vehicles that have been replaced or converted for them to count towards this year’s compliance schedule. If you are already replacing vehicles under ACF, then we recommend you watch the full series of CARB TRUCRS ACF reporting guideline webinar – this Q&A from March 5th is particularly useful.

2 – Selecting your compliance schedule – Model Year or Milestone

One important step in your reporting is to select one of two compliance pathways that you would like to apply to your fleet. If you don’t select a pathway, your fleet will automatically subscribe to the ZEV Purchase Schedule, also known as the “model year schedule.”

This is an important point. For many fleets the default Model Year Schedule is going to be a more aggressive transition schedule.

The alternative option for your compliance pathway is called the ZEV Milestone Option, which may be more flexible for many types of fleets. You can read more about the details of the two options here.

Note: switching to the ZEV Milestone Option is a one-way door. You cannot return to the Model year Schedule once you opt into the Milestone Option.

To select a pathway, go to your “Company Info” tab in the TRUCRS portal. At the bottom of this page is the “Regulations your fleet is subject to” section. Here, you can opt into the Milestone Option.

3 – Applying for extensions and exemptions

Another important step is to apply for extensions and exemptions. To do this, email TRUCRS@arb.ca.gov and include your TRUCRS ID # in the email correspondence.

4 – Getting your compliance status certificate

After making all your fleet profile updates and adding or editing all your vehicles, you can get your compliance certificate.

Access the “Compliance Status” tab of your account. If you’ve entered all the information correctly, you should see a green note at the bottom of the screen saying “Fleet is in Compliance with Advanced Clean Fleets”.

So long as you see only green messages in this section, you should be able to print your compliance status certificate from that menu.

Reach out to Port Power to discuss your EV transition

Port Power was founded to make going EV as easy as operating diesel.

Whether you are a fleet operator buying your first EV trucks or a city administrator tasked with figuring out your plan, reach out to schedule a consultation with the team at Port Power for help with:

  • Getting the full range of options you have to manage this transition
  • Having a soup-to-nuts, managed solution for all your fleet charging and operations needs
  • Visibility into grant and funding opportunities to help you with this transition

Get in touch with us today: https://portpower.us/contact/

 

Uncategorized

Three things to know about fleet EV charging

I shared three must-know issues about fleets’ challenges in the transition to EV with a popular tech & business show, the Village Global Podcast. 

 

Why it matters: Too few decision makers in tech, business, and regulation understand the challenges that commercial fleets face with EVs.

  • Conventional thinking is that “it’s a no brainer with lower TCO”
  • But that overlooks the massive investment required in charging & operations changes

 

Issue 1 – Fleet & energy schedules must connect: Energy has always been a cost center for fleets. But with electrification, it is now an operational & scheduling issue.

  • Since charging takes 45 minutes minimum, without a carefully-planned charge schedule, drivers may be sitting idle much of the day.
  • Congestion at charging facilities is getting far worse, making opportunistic fast-charges dangerously unreliable without scheduled slots.

 

Issue 2 – “A Tesla Supercharger in every backyard”: The core solution is for fleets to build their own on-site charging infrastructure. That’s no small feat.

  • EV pilots are easy – you can keep EVs on light missions, and rely on your existing facility’s plugs to slow charge.
  • But you hit 10% EV, the script flips.
  • Charging dozens of cars takes enormous power – even if you’re slow charging most of them. Add a few DCFC, and you’re in Supercharger territory.

 

Issue 3 – The grid isn’t ready: Fleets face years-long waits to get enough power for even a fraction of their overall fleet charging needs. 

  • Again, small pilots are easy – with only a few cars, your existing grid connect works fine
  • But when you need to scale, suddenly you can’t
  • The solution: solar, stationary battery storage, and generators

 

Port Power makes EV as easy as diesel

Port Power was founded by EV industry veterans to solve this exact problem. We are a full solution provider that partners with fleet operators and their real estate partners to solve the charging problem today and scale it to handle all future needs.

Whether you are a fleet operator buying your first EV trucks or a city administrator tasked with figuring out your plan, reach out to schedule a consultation with the team at Port Power for help with:

  • Clearly understanding the transition timelines that apply to your business
  • Getting the full range of options you have to manage this transition
  • Having a soup-to-nuts, managed solution for all your charging needs
  • Getting the government incentives your business deserves without the headache of manual reporting

Get in touch with us today: https://portpower.us/contact/

A big thanks to the team at Village Global for hosting this conversation, which you can find on Spotify, Apple Podcasts, and Google Podcasts. The show’s host Olga Serhiyevich is a pro at deep-dives into industry, so the clips above are summarized clips from key segments.

Fleet of vehicles for the department of public works Uncategorized

What ACF rules mean for your municipal fleet

The move to zero emissions is one of the most important and complex changes that city and county fleet managers have had to tackle in generations.

A wave of state and federal support makes this change achievable. And vehicles and charging equipment are finally proving to be suitable to handle the job. Now, it’s on fleet managers to take action.

Here’s a quick guide on what to know if you’re a city, county, or affiliated fleet evaluating your next steps.

Most fleets need to act now

Ever since California mandated transit agencies purchase only zero emissions buses starting in 2029, municipal fleets of all sorts have been waiting to see what would come their way.

As of 2023, they have their answer. Through this year’s ACF regulations, all varieties of municipal fleets must have 50% of new vehicle purchases be zero emissions in 2024. And by 2027, all new vehicles purchased must be zero emissions.

With average municipal fleet replacement cycles hovering around 8 to 15%, this means that even smaller entities will be taking receipt of a dozen electric cars and trucks sometime within the next year.

Fleet of vehicles for the department of public works

The challenge is charging & operations

The good news is that between the F-150 Lightning, the Silverado EV, the Transit EV, and smaller vehicles like the Chevy Bolt, Mustang Mach-E and others, there are finally a lot of EV options that are affordable for government fleets. And with EV maintenance being far easier than ICE, your future fleet will be easier to maintain and longer-lasting.

The flipside is that keeping these vehicles charged up and ready to perform is no small feat. It’s not uncommon to hear of cities purchasing 1.2 or even 1.5 EVs for every traditional vehicle they are replacing, just because of the challenges in keeping the EVs charged and running to meet all the missions.

In some cases, this is justified – you just can’t refuel enough EVs fast enough to have them replace your gas or diesel trucks 1:1.

But in many cases, being a little smarter about how you manage charging and fleet operations can make this transition a lot less complex.

Operational excellence looks very different for EVs than it does for traditional vehicles. Having smart integration between your EVs, your charging depots, and your energy resources can be the difference between an affordable, smooth transition and an expensive or bumpy one.

One city in California that has taken a progressive approach towards building a smart solution is Laguna Beach. Laguna Beach’s director of transit and community services told the LA Times recently “obviously, you can go and buy an electric vehicle fairly easily, but the important thing is to have the charging infrastructure and the electric grid infrastructure backing it up, so that you’re able to effectively operate those vehicles and ensure that they’re able to be charged in the places they need to be charged.”

Without designing a system that fully integrates the vehicles, fleet operations & schedules, your charging infrastructure and the electrical resources you have available, even modest sized fleets will quickly run into problems.

Litschi added: “I’m very familiar with a lot of [municipal] agencies who have gone down that road and have dozens of buses parked that they can’t use because they have no way to charge them.”

Laguna Beach FD truck sits ready to respond to missions
Laguna Beach is one of the California cities that has recently taken control of its fleet electrification with a comprehensive plan that includes managing its own EV charging depots

Below are the two KEY questions you need to answer on the way to your fleet transition.

The “happy path” for municipal fleet charging

When a user manages to achieve their goals with basically no disruptions, product designers call that the Happy Path. Let’s look at what the happy path would look like for a hypothetical city in California – San BernDiego.

Decision 1: to build or not?

In all but the largest and most complex gas and diesel fleets, most refueling happens at the same fuel stations that are used by the general public. And it’s easy! Municipal drivers are given fuel cards, and they are able to fill up whenever they need at stations that are pretty widely available. Refueling today is so quick it doesn’t really factor into general fleet readiness or operational scheduling.

But because charging takes a long time, fleets need to treat public charging facilities as a backup, and instead invest in their own, dedicated charging infrastructure in their fleet’s parking lots.

The Challenged Road: In one scenario, San BernDiego might have waited to take receipt of the first vehicles to begin trialing the use of some well located public charging infrastructure before deciding if it needed to build its own. But in this scenario, they would have found their employees wasting time sitting at charging stops for upwards of two hours. And when the stations were full with public users, some city EVs weren’t reporting ready for the job.

The Happy Path: But San BernDiego built charging on its own municipal fleet parking lots to ensure that he could charge his vehicles when they were already parked and sitting idle, for the most part overnight. This ensures that the vehicles would almost always be charged and ready to go for the standard duty cycles.

Aerial shot of a fleet of municipal parks & recs vans outside of a park with a city worker mowing grass
The easiest vehicles to start electrifying in your overall city or county fleet will be sedans and light duty trucks – including the trucks & vans used by parks & rec departments.

Decision 2: to manage or not?

Filling up with gas was always a cost driver, but rarely an operational consideration. Electricity is the opposite: affordable, but operationally complex. And ultimately, saving a few dollars on gas doesn’t matter if your fleet operations grind to a halt.

It is likely that your parking lot might not have access to enough power to charge more than a few vehicles at a time. Also consider that most charging is going to take hours. Suddenly, if you have three or four vehicles coming back at the same time to charge, you have to decide which one to charge first. Sure, the “easy” solution is to get the utility to give you enough power to charge everyone at once. But you will likely have to wait years, pay a high price for grid upgrades and be susceptible to utility outages that are getting more and more common in California. This is why managing schedules and responding to events in real time is going to be a core part of running charging depots!

Even if the charge scheduling might seem simple initially, extrapolate it across dozens of vehicles and chargers and you’ll understand that managing the constraints around energy, charging speed, and charging spaces is complex – and critical to ensuring your fleet works.

The Challenged Road: In one scenario, San BernDiego might have simply installed the fastest charger they could afford with the goal of keeping congestion to a minimum. But when the grid upgrade to free up space for the next few chargers came back at 18 months, they faced a dilemma: while it charged vehicles in just 40 minutes, having a whole row of EVs charged overnight required someone to cycle the cars one by one. So the “most powerful” solution wasn’t actually the right one!

The Happy Path: San BernDiego didn’t do this. Instead, it constructed a series of lower-power chargers alongside a mid-range fast charger. While they don’t have the power to run all simultaneously, the fast charger can be used for opportunistic top-ups when a new mission comes out of the blue, while the row of slower chargers can run altogether overnight to charge up many vehicles ahead of the morning shift. Managing how all of these are timed is handled with almost no staff input – charging operations management software gives their drivers clear instructions as to when and where to plug cars in.

Bonus: how smart management can help your fleet shine

Managing complexity to keep your fleet running requires new tools – but, as in much of life, tackling these challenges might not necessarily win you any awards.

But EVs offer your fleet a chance to really shine. With the right systems in place, your fleet can begin bringing incentive cash flow to your municipal organization, or even become a cornerstone of your city and county’s resilience infrastructure.

The Challenged Road: In one scenario, San BernDiego managed its chargers manually. In the event of a power outage across the city, requests to draw power from either their stationary backup system or the batteries in their cars fell to the coordination of their staff – which meant it couldn’t be done in real time and wasn’t eligible for subsidies from the State or Federal government for resilience resourcing. And to claim LCFS credits from California, the accounting department was tasked with many hours of manual work reviewing metering & bills.

The Happy Path: But San BernDiego used charging operations management software to run their depots and fleets. This software automated the whole process making energy accessible for resilience purposes. It also cut down on standard overhead like reporting to get LCFS credits!

Street sweeper
Eventually, all vehicles in your fleet will have to transition to electric. Some, such as street sweepers, are available already. The challenge is just setting up the charging depots to ensure you keep them up and running.

Port Power makes EV as easy as diesel

Port Power was founded by EV industry veterans to solve this exact problem. We are a full solution provider that partners with fleet operators and their real estate partners to solve the charging problem today and scale it to handle all future needs.

Unlike the EV charging infrastructure help that might come from an OEM, a charge point operator, or your local utility, Port Power is an independent player responsive to the specific needs of your fleet.

Unlike consulting firms and electrical contractors, Port was founded around a set of proprietary technologies that allow us to deliver solutions that are truly hassle-free and capable of scaling up in an economical way as your fleet adopts more EVs.

Whether you are a fleet operator buying your first EV trucks or a city administrator tasked with figuring out your plan, reach out to schedule a consultation with the team at Port Power for help with:

  • Clearly understanding the transition timelines that apply to your business
  • Getting the full range of options you have to manage this transition
  • Having a soup-to-nuts, managed solution for all your charging needs
  • Getting the government incentives your business deserves without the headache of manual reporting

Get in touch with us today: https://portpower.us/contact/

Coca Cola distributor in Ocala Florida Uncategorized

What EVs mean for F&B distribution fleets

Food and beverage distributors are a pillar of the restaurant and grocery retail industry – and today they’re some of the businesses most impacted by environmental regulations like California’s ACF rules (the law of the land that requires many distribution fleets to transition to EV now). While green credentials has been nice marketing for a while, adopting electric vehicles is quickly becoming a mandate, not a nice-to-have.

The bright side of this change is that light and medium duty EVs are finally becoming widely available – and affordable, too. The F&B distributor’s biggest challenge is actually different: keeping these vehicles charged without interrupting their missions, and without needing to hire new depot operations managers.

Lessons from the US’s largest food distribution center

The Food Distribution Center in Hunts Point of the Bronx is the largest of its kind in the US, with a massive fresh produce terminal, fish market, and warehouses for everyone from nationals like Dairyland to regional family-owned distributors like Katzman’s. Literally tens of thousands of restaurants, grocers, and corner stores are stocked weekly by fleets based in and around this distribution center.

You might be surprised to know that a comprehensive survey of the fleet operators here showed their distribution routes were hands-down achievable with the EVs available today from Mitsubishi Fuso, Daimler Trucks and others. In fact, in the case of Hunts Point, the average delivery route was under 60 miles – compare that to the eCanter’s 80 to 200 mile range options. Furthermore, while EV trucks remain more expensive, government incentives covered over 90% of the cost difference for the fleets who upgraded to electric, and the cost savings on fuel and maintenance easily make electric trucks more cost effective for most fleets. That’s why several fleets at Hunts Point have already begun adopting electric trucks on many of their routes. So where’s the rub?

The lack of charging infrastructure is proving to be the biggest challenge slowing fleet managers trying to integrate EVs.

While EVs get the job done just like diesel trucks, fueling them is quite different.

First, charging is much slower than fueling. Fleets can’t waste driver time stopping at a public charging station. Instead, fleets need to be charging when and where their trucks are already normally sitting idle. That means distributors at Hunts Point need charging for their vehicles at the lots they park at overnight or when waiting for pickups.

Second, charging takes a lot of power. So when fleets try to build charging stations on-site, they end up stuck in years-long queues for utility upgrades, or they have to start using complex electrical equipment to store and generate power on-site.

So how ready is infrastructure, really?

The infrastructure to charge commercial vehicles is ready to scale – in theory. The good news is that we aren’t waiting on breakthrough new technologies to make charging possible. The bad news is that the charging equipment out there is far too complex to build, operate and expand for the average fleet (if you want to know why, check out our longer explainer on how fleet charging works at warehouses & distribution centers).

Daimler Truck Charging Depot
Daimler Truck’s demonstration charging depot

Katzman’s distributors in Hunts Point were early adopters – and reportedly spent 10 years going through the design, permitting, installation and adjustments to their various electrical systems to keep their zero emissions refrigerated trailers running. In other locations throughout the US, fleet managers are having to become experts on managing conversations with utilities on the one hand, and calculating what electrical load their fleet is forecasted to need when procuring equipment on the other hand. Fleet managers don’t have the time or resources to do this. They need a simple and effective tool to make EV charging easy to roll out and operate.

Port Power makes EV as easy as diesel

Port Power was founded by EV industry veterans to solve this exact problem. We are a full solution provider that partners with fleet operators and their real estate partners to solve the charging problem today and scale it to handle all future needs.

Unlike the EV charging infrastructure help that might come from an OEM, a charge point operator, or your local utility, Port Power is an independent player responsive to the specific needs of your fleet.

Unlike consulting firms and electrical contractors, Port was founded around a set of proprietary technologies that allow us to deliver solutions that are truly hassle-free and capable of scaling up in an economical way as your fleet adopts more EVs.

Whether you are a fleet operator buying your first EV trucks or a warehouse property manager whose clients have asked about supporting EV, reach out to schedule a consultation with the team at Port Power for help with:

  • Clearly understanding the transition timelines that apply to your business
  • Getting the full range of options you have to manage this transition
  • Having a soup-to-nuts, managed solution for all your charging needs
  • Getting the government incentives your business deserves without the headache of manual reporting

Get in touch with us today: https://portpower.us/contact/